Infasco Case Study

How Infasco Increased Its Productivity by 18% and Reduced Its Average Repair Time by 33% in Less Than a Year

Infasco logo, manufacturer of industrial fasteners, featured in the client case study with Intelligence Industrielle on machine connectivity.

Infasco : Global Leader in Fastening Components.

Established in 1960, Infasco, a member of the Heico Companies group, excels in the design and manufacturing of fastening components. Its expertise spans the transportation, construction, and energy sectors, making it a key player in its field.

Infasco industrial fasteners — client success story with Intelligence Industrielle on machine connectivity.

Lack of Visibility into production

Infasco faced major challenges due to a lack of real-time visibility on its production floor. This led to untracked downtimes and suboptimal resource allocation.

Major Issue

Lack of key indicators such as MTTR, MTBF, and OEE; monitoring of bolting machines was impossible.

Negative Impact

Loss of performance and untracked downtimes leading to additional costs.

Worker on Infasco’s production floor, manufacturer of industrial fasteners, featured in the client case study with Intelligence Industrielle on machine connectivity.

A More Efficient Connected Production

Visibility

Infasco aims to transform its production through key performance indicators.

OEE at 84%

With reduced downtime to maximize productivity.

Proactive Management

Reliable data for fast, informed decision-making.

Connectivity and Performance Monitoring

The OEE solution provides advanced connectivity between your machines, enabling real-time tracking of key indicators such as availability, performance, and quality. Thanks to an intuitive interface, users at all levels (Management, Supervision, Shop Floor) can access essential data to optimize production.

Intelligence Industrielle dashboard displaying availability at 66.7% and quality at 100% on circular charts. The indicators are placed over a map to show that they can be tracked from anywhere, with a bar chart below illustrating the progression of completed pieces.

Project Timeline.

The implementation of the project was carefully planned. Each phase was monitored to ensure success.

Week 1

Scoping Workshop

We started with a scoping workshop to define the requirements. This helped align all stakeholders.

Week 2

Project Management

Weekly follow-ups were implemented to ensure steady progress. This allowed for quick identification of any obstacles.

Week 3

Machine Connectivity

We connected over 50 machines in record time, enabling better data collection.

Week 4

Dashboards and Final Delivery

Real-time dashboards were implemented, providing instant visualization of performance.

Infasco’s Results with the OEE Solution

In just 8 months, Infasco achieved a return on investment of 18.75x.

94,2%

MTTR reduced from 260 to 175 minutes.

18,75x

Visibility across 50+ machines.